{"id":11339,"date":"2025-08-26T07:57:57","date_gmt":"2025-08-26T10:57:57","guid":{"rendered":"https:\/\/nnpress.ca\/?p=11339"},"modified":"2025-08-26T07:57:58","modified_gmt":"2025-08-26T10:57:58","slug":"weekly-provincial-traffic-advisories-3","status":"publish","type":"post","link":"https:\/\/nnpress.ca\/index.php\/2025\/08\/26\/weekly-provincial-traffic-advisories-3\/","title":{"rendered":"Weekly Provincial Traffic Advisories."},"content":{"rendered":"\n<p>INVERNESS COUNTY: Glendale Mountain Road, Glendale<\/p>\n\n\n\n<p>Glendale Mountain Road, two kilometres north of Highway 105, is closed for culvert replacement until Monday, September 15.<\/p>\n\n\n\n<p>A detour and traffic control are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Highway 105, Whycocomagh<\/p>\n\n\n\n<p>Highway 105 from 465 metres east of Morrison Road easterly for seven kilometres is reduced to one lane for paving and patching until Monday, September 29.<\/p>\n\n\n\n<p>Traffic control will be in place. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Highway 106, Pictou<\/p>\n\n\n\n<p>Highway 106, between Granton Abercrombie Road and the Pictou Rotary, will be reduced to one lane for approximately 4.5 kilometres for paving until Monday, August 25.<\/p>\n\n\n\n<p>Traffic control will be in place. Work takes place 6 a.m. to 8 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Matthews Road, Cleveland<\/p>\n\n\n\n<p>Matthews Road, 0.3 kilometres north of County Line Road is reduced to one lane for culvert replacement until Thursday, August 28.<\/p>\n\n\n\n<p>Traffic control will be in place. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Mountain Road, Seaview<\/p>\n\n\n\n<p>Mountain Road, 0.7 kilometres south of Morrison Road is reduced to one lane for culvert replacement until Monday, September 15.<\/p>\n\n\n\n<p>Traffic control will be in place. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>SHELBURNE COUNTY: Trunk 3, Shag Harbour<\/p>\n\n\n\n<p>Trunk 3 from Evelyn Richardson Memorial Elementary School Westerly for three kilometres will be reduced to one lane for paving until Sunday, November 30.<\/p>\n\n\n\n<p>Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\">CONTINUING WORK<\/h4>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CAPE BRETON REGIONAL MUNICIPALITY: Crawley Creek Bridge, Point Aconi<\/p>\n\n\n\n<p>The Crawley Creek Bridge on Point Aconi Road will be closed for repairs until Friday, September 5.<\/p>\n\n\n\n<p>A detour and traffic control will be in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Highway 104 Overpass, North River<\/p>\n\n\n\n<p>The Highway 104 westbound overpass is reduced to one lane for repairs until Friday, October 31.<\/p>\n\n\n\n<p>Work takes place weekdays from 7 a.m. to 6 p.m., but the lane is closed 24 hours a day. Signs are in place, and motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Lower Portapique Bridge, Portapique<\/p>\n\n\n\n<p>The Lower Portapique Bridge on Trunk 2 is closed for repairs until further notice.<\/p>\n\n\n\n<p>The detours are East Montrose Road and West Montrose Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Route 311, North River<\/p>\n\n\n\n<p>Route 311 from Farnham Mill Road to Mountain Lee Road is reduced to one lane for bridge work until Friday, October 31.<\/p>\n\n\n\n<p>Work takes place weekdays from 7 a.m. to 6 p.m. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Slade Road, Tatamagouche<\/p>\n\n\n\n<p>Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Wittenburg Road, Wittenburg<\/p>\n\n\n\n<p>Wittenburg Road from Coldstream Road to Route 224 will be closed for culvert replacement until Friday, October 3.<\/p>\n\n\n\n<p>A detour and traffic control will be in place. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HALIFAX REGIONAL MUNICIPALITY: Highway 107, Lower Sackville<\/p>\n\n\n\n<p>There are two closures on Highway 107 in Lower Sackville:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the northbound on-ramp to Highway 102 at Exit 4C<\/li>\n\n\n\n<li>the southbound on-ramp at the new Highway 102 overpass<\/li>\n<\/ul>\n\n\n\n<p>Traffic will be detoured to the Exit 4C roundabouts:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Highway 102 northbound traffic will exit at the first roundabout<\/li>\n\n\n\n<li>Highway 102 southbound traffic and traffic heading toward Halifax or the Annapolis Valley will proceed to the second roundabout<\/li>\n<\/ul>\n\n\n\n<p>Work is expected to be complete Tuesday, September 16.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: East Street, Port Hood<\/p>\n\n\n\n<p>East Street from Trunk 19 to the end of pavement is reduced to one lane for paving, ditching and culvert replacement until Saturday, August 30.<\/p>\n\n\n\n<p>Work takes place weekdays from 7 a.m. to 7 p.m. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Hunters Road, Port Hood<\/p>\n\n\n\n<p>Hunters Road from Trunk 19 to Little Mabou Road will be reduced to one lane for paving until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Kings Road, Port Hastings<\/p>\n\n\n\n<p>Kings Road from Charles MacLean Road to the end of pavement is reduced to one lane for paving, ditching and culvert replacement until Saturday, August 30.<\/p>\n\n\n\n<p>Work takes place weekdays from 7 a.m. to 7 p.m. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: New Ferry Road, Mabou<\/p>\n\n\n\n<p>New Ferry Road from Little Mabou Road northerly for about 900 metres is reduced to one lane for paving until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control will be on-site. Work takes place weekdays from sunrise to sunset. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Trunk 19, Port Hood<\/p>\n\n\n\n<p>Trunk 19 from 75 metres south of East Street northerly to the Southwest Mabou Bridge is reduced to one lane for paving, ditching and culvert replacement until Tuesday, September 30.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Upper Southwest Mabou Road, Port Hood<\/p>\n\n\n\n<p>Upper Southwest Mabou Road from Trunk 19 to Beaton Road is reduced to one lane for paving until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset. Motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Moore\u2019s Ford Bridge, River John<\/p>\n\n\n\n<p>Moore\u2019s Ford Bridge on West Branch Road will be closed until further notice.<\/p>\n\n\n\n<p>The detour is via West Branch Road, College Grant Road and Route 256.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Pryor McDonald Bridge, McPhersons Mills<\/p>\n\n\n\n<p>The northbound lane of the Pryor McDonald Bridge on Route 347 (Sherbrooke Road), is closed for repairs to the bridge until Friday, September 26.<\/p>\n\n\n\n<p>Temporary traffic signals are in place, and work takes place weekdays from sunrise to sunset. The lane will be closed 24 hours a day, and drivers should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Welsford Bridge, River John<\/p>\n\n\n\n<p>Welsford Bridge on Old Pictou Road will be closed until further notice.<\/p>\n\n\n\n<p>The detour is via Old Pictou Road, Allen Road, Trunk 6 and River John Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Janvrin Harbour Road, Port Royal<\/p>\n\n\n\n<p>Janvrin Harbour Road from 1.4 kilometres west of Moucliere Bridge westerly to the end of pavement (about four kilometres) is reduced to one lane for repaving and guardrail installation until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Loch Lomond Road, Loch Lomond<\/p>\n\n\n\n<p>Loch Lomond Road has alternating lane closures for upgrades and culvert repairs until Monday, September 29.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place from sunrise to sunset, including weekends.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Soldiers Cove Road, Soldiers Cove<\/p>\n\n\n\n<p>Soldiers Cove Road is reduced to one lane for repaving and culvert repairs until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place from sunrise to sunset. Weekend work is expected.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: St. Peters Fourchu Road, St. Esprit<\/p>\n\n\n\n<p>St. Peters Fourchu Road from 0.4 kilometres east of Ferguson Road easterly for four kilometres is reduced to one lane for repaving and guardrail installation until Friday, October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place from sunrise to sunset. Weekend work is expected.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Veterans Memorial Drive, Arichat<\/p>\n\n\n\n<p>Veterans Memorial Drive is reduced to one lane for paving, ditching and culvert repairs until Tuesday, September 30.<\/p>\n\n\n\n<p>Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: West Bay Road, French Cove<\/p>\n\n\n\n<p>West Bay Road is reduced to one lane for paving, ditching and culvert repairs until Tuesday, September 30.<\/p>\n\n\n\n<p>Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>YARMOUTH COUNTY: Pembroke Bridge, Yarmouth<\/p>\n\n\n\n<p>The Pembroke Bridge on Pembroke Road is closed for replacement until Sunday, August 31.<\/p>\n\n\n\n<p>Detour signs are in place.<\/p>\n\n\n\n<p>Source : Provincial Release <\/p>\n","protected":false},"excerpt":{"rendered":"<p>INVERNESS COUNTY: Glendale Mountain Road, Glendale Glendale Mountain Road, two kilometres north of Highway 105, is closed for culvert replacement<\/p>\n","protected":false},"author":1,"featured_media":10886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6,10,12,13,18],"tags":[],"class_list":["post-11339","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general","category-latest","category-news","category-top-stories"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/comments?post=11339"}],"version-history":[{"count":1,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11339\/revisions"}],"predecessor-version":[{"id":11340,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11339\/revisions\/11340"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media\/10886"}],"wp:attachment":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media?parent=11339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/categories?post=11339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/tags?post=11339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}