{"id":11739,"date":"2025-12-03T11:11:05","date_gmt":"2025-12-03T14:11:05","guid":{"rendered":"https:\/\/nnpress.ca\/?p=11739"},"modified":"2025-12-03T11:11:06","modified_gmt":"2025-12-03T14:11:06","slug":"provincial-weekly-traffic-advisories-6","status":"publish","type":"post","link":"https:\/\/nnpress.ca\/index.php\/2025\/12\/03\/provincial-weekly-traffic-advisories-6\/","title":{"rendered":"Provincial Weekly Traffic Advisories."},"content":{"rendered":"\n<p>CONTINUING WORK<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CAPE BRETON REGIONAL MUNICIPALITY: Campbell Brook Bridge, Sydney<\/p>\n\n\n\n<p>The Campbell Brook Bridge on Keltic Drive is closed for replacement until July 31, 2026.<\/p>\n\n\n\n<p>The detour is via Route 305 to Northwest Arm Road to Route 239 to Route 305. The bridge is closed 24 hours a day, seven days a week.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CAPE BRETON REGIONAL MUNICIPALITY: Highway 125, Sydney<\/p>\n\n\n\n<p>The intersection of Highway 125 and Grand Lake Road is reduced to one lane for overnight roadwork until Monday, December 15.<\/p>\n\n\n\n<p>Traffic control is in place. Work takes place nightly from sunset to sunrise.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CAPE BRETON REGIONAL MUNICIPALITY: Trunk 4, Sydney River<\/p>\n\n\n\n<p>Trunk 4 (Kings Road) between the Sydney River roundabout and the Kenwood Drive roundabout is reduced to one lane for roadwork until Monday, December 15.<\/p>\n\n\n\n<p>Traffic control is in place. Work takes place daily from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Highway102, Millbrook to Shortts Lake<\/p>\n\n\n\n<p>Highway 102 southbound from the Millbrook interchange to the Shortts Lake Road overpass is reduced to one lane for paving until Friday, December 12.<\/p>\n\n\n\n<p>The speed limit is reduced, and traffic will be stopped for short periods. Work takes place daily from 7 a.m. to 7 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Slade Road, Tatamagouche<\/p>\n\n\n\n<p>Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>GUYSBOROUGH COUNTY: Pirate Harbour Bridge, Pirate Harbour<\/p>\n\n\n\n<p>The Pirate Harbour Bridge on Route 344 is reduced to one lane for construction until Saturday, December 20.<\/p>\n\n\n\n<p>Traffic signals are in place, and motorists should expect delays. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HALIFAX REGIONAL MUNICIPALITY: Exit 3, Highway 102, Bedford<\/p>\n\n\n\n<p>The Highway 102 southbound off-ramp at Exit 3 (to Hammonds Plains Road) is closed between 9:30 a.m. and 3:30 p.m. on weekdays for the ramp-widening project:&nbsp;<a href=\"https:\/\/news.novascotia.ca\/en\/2025\/11\/12\/upgrades-exit-3-highway-102\">https:\/\/news.novascotia.ca\/en\/2025\/11\/12\/upgrades-exit-3-highway-102<\/a>.<\/p>\n\n\n\n<p>The work is expected to be finished by Friday, December 19. The detour is via Exit 2B (to Larry Uteck Boulevard).<\/p>\n\n\n\n<p>The ramp is open evenings and weekends.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HALIFAX REGIONAL MUNICIPALITY: Highway 118, Dartmouth<\/p>\n\n\n\n<p>Highway 118 from the intersection with Micmac Boulevard to one kilometre south of Exit 13E is reduced to one lane for road construction until Friday, December 19.<\/p>\n\n\n\n<p>Traffic control is in place. Work takes place daily from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HANTS COUNTY: Highway 102, Enfield<\/p>\n\n\n\n<p>Highway 102 southbound from Exit 7 to Exit 5A is reduced to one lane for paving until Tuesday, December 16.<\/p>\n\n\n\n<p>Work takes place 24 hours a day, seven days a week, except weekdays from 7 a.m. to 9 a.m. and Fridays between noon and 6 p.m. Traffic control is in place and motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HANTS COUNTY: Highway 102, Enfield<\/p>\n\n\n\n<p>Highway 102 southbound between Exit 7 and Exit 8 is reduced to one lane for paving until Tuesday, December 16.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HANTS COUNTY: Route 215, Burlington<\/p>\n\n\n\n<p>Traffic is reduced to one lane on Beaver Pond Road (Route 215) until Friday, December 5.<\/p>\n\n\n\n<p>Work takes place from sunrise to sunset. Traffic control will be on-site, and motorists should expect delays.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HANTS COUNTY: Shubenacadie Bridge, Trunk 2<\/p>\n\n\n\n<p>The Shubenacadie Bridge on Trunk 2 at Route 224 is reduced to one lane until Tuesday, December 16.<\/p>\n\n\n\n<p>Traffic signals are in place, and work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HANTS COUNTY: Trunk 1, Windsor<\/p>\n\n\n\n<p>Trunk 1 from the Windsor town line to the St. Croix Bridge is reduced to one lane for construction until further notice.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>LUNENBURG COUNTY: Highway 103 Twinning, Hubbards to Chester<\/p>\n\n\n\n<p>Highway 103 from two kilometres west of Exit 6 to four kilometres west of Exit 7 has temporary lane closures for blasting until May 2027.<\/p>\n\n\n\n<p>The work is planned for most weekdays at about 10 a.m. and 2 p.m. for about 10 minutes at a time. The eastbound and westbound lanes are both closed during the blasting. Traffic control is in place.<\/p>\n\n\n\n<p>There will not be blasting or lane closures on the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>after noon on Fridays<\/li>\n\n\n\n<li>holidays and days before holidays<\/li>\n\n\n\n<li>weekends.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Moore\u2019s Ford Bridge, River John<\/p>\n\n\n\n<p>The Moore\u2019s Ford Bridge on West Branch Road will be closed until further notice.<\/p>\n\n\n\n<p>The detour is via West Branch Road, College Grant Road and Route 256.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Welsford Bridge, River John<\/p>\n\n\n\n<p>The Welsford Bridge on Old Pictou Road is closed until further notice.<\/p>\n\n\n\n<p>The detour is via Old Pictou Road, Allen Road, Trunk 6 and River John Road.<\/p>\n\n\n\n<p>Source : Provincial Release <\/p>\n","protected":false},"excerpt":{"rendered":"<p>CONTINUING WORK CAPE BRETON REGIONAL MUNICIPALITY: Campbell Brook Bridge, Sydney The Campbell Brook Bridge on Keltic Drive is closed for<\/p>\n","protected":false},"author":1,"featured_media":10886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6,10,12,13,18],"tags":[],"class_list":["post-11739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general","category-latest","category-news","category-top-stories"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/comments?post=11739"}],"version-history":[{"count":1,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11739\/revisions"}],"predecessor-version":[{"id":11740,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/11739\/revisions\/11740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media\/10886"}],"wp:attachment":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media?parent=11739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/categories?post=11739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/tags?post=11739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}