{"id":13531,"date":"2026-09-21T11:31:41","date_gmt":"2026-09-21T14:31:41","guid":{"rendered":"https:\/\/nnpress.ca\/?p=13531"},"modified":"2026-09-21T11:31:42","modified_gmt":"2026-09-21T14:31:42","slug":"province-wide-weekly-traffic-advisories","status":"publish","type":"post","link":"https:\/\/nnpress.ca\/index.php\/2026\/09\/21\/province-wide-weekly-traffic-advisories\/","title":{"rendered":"Province Wide Weekly Traffic Advisories."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>NEW WORK<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">KINGS COUNTY: South Bishop Road, Coldbrook<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">South Bishop Road from Trunk 1 to Highway 101 is reduced to one lane until Monday, November 30, for ditch, culvert and paving work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is on-site. Work takes place daily from 7 a.m. to 7 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CONTINUING WORK<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">ANTIGONISH COUNTY: Trunk 16, Upper Big Tracadie<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Trunk 16 has alternating lane closures until Wednesday, September 30, for culvert replacement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Signs and traffic lights are in place. Work takes place daily from 7 a.m. to 7 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">CAPE BRETON REGIONAL MUNICIPALITY\/VICTORIA COUNTY: Barra Strait Bridge, Grand Narrows\/Iona<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Barra Strait Bridge has stop-and-go traffic until Friday, September 25, for repaving.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work takes place from 7 a.m. to 6 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">CAPE BRETON REGIONAL MUNICIPALITY: Campbell Brook Bridge, Sydney<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Campbell Brook Bridge on Keltic Drive is closed for replacement until Sunday, December 20.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The detour route includes Route 305, Northwest Arm Road and Route 239.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">CAPE BRETON REGIONAL MUNICIPALITY: Catalone Lake Truss Bridge, Catalone Gut and Bateston<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Catalone Lake Truss Bridge on Mira Bay Drive is closed until Monday, November 30, for replacement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control and detour signs are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">CAPE BRETON REGIONAL MUNICIPALITY: Trunk 4, Howie Centre and Sydney River<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Trunk 4 from Aspen Grove Road easterly to the Exit 6 eastbound off-ramp from Highway 125 is reduced to one lane until Wednesday, September 30, for roadwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work takes place Sunday through Thursday from 7 p.m. to 6 a.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">COLCHESTER COUNTY: Barnhill Bridge, Belmont<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Barnhill Bridge on Belmont Road, located between Cross Road and Plains Road, is closed until further notice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detour signs are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">COLCHESTER COUNTY: Edmund Lynds Bridge, North River<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Route 311 between civic addresses 1333 and 1457 is closed for replacement of the Edmund Lynds Bridge until Monday, November 30.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The detour route includes Route 311, Upper Brookside Road, Brookside Road and Mountain Lee Road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detour signs are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">COLCHESTER COUNTY: Salmon River Truss Bridge, Truro<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Salmon River Truss Bridge connecting Walker and Main streets will have alternating lane closures for roadwork until Wednesday, September 30.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work takes place daily from sunrise to sunset; signs and traffic lights are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">COLCHESTER COUNTY: Upham Bridge, Bayhead<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Upham Bridge on Trunk 6 is closed until further notice for repairs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The detour route includes Malagash Road, Highland Road, West Tatamagouche Road and Slade Road. Detour signs are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">GUYSBOROUGH COUNTY: Country Harbour Cable Ferry<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Country Harbour cable ferry is out of service until late October. The interruption in service is needed to complete the dry-dock inspection and maintenance required by Transport Canada every five years.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">GUYSBOROUGH COUNTY: Route 344, Aulds Cove<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Route 344 from one kilometre south of Highway 104 southerly to Loggie Street has alternating lane closures until Wednesday, September 30, for roadwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is in place. Work takes place Monday to Friday from 6 a.m. to 8 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">HANTS COUNTY: Highway 102, Enfield<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Highway 102 between Exit 7 and Exit 8 is reduced to one lane at times both northbound and southbound for construction in the median.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work takes place from sunrise to sunset until Saturday, October 31.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">HANTS COUNTY: Robinson Road, Shubenacadie<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Robinson Road between Meadow Drive and Mill Village Road is reduced to one lane until Saturday, October 31, for roadwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is in place. Work takes place Monday to Friday from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">INVERNESS COUNTY: Cenotaph Road, West Bay<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cenotaph Road from Big Brook Road northerly for about three kilometres is reduced to one lane until Friday, October 30, for roadwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is in place. Work takes place Monday to Friday from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">INVERNESS COUNTY: Little Mabou Road, Port Hood<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Little Mabou Road between Main Street and Trunk 19 is reduced to one lane until Friday, October 30, for roadwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is in place. Work takes place Monday to Friday from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">LUNENBURG COUNTY: Highway 103 Twinning, Hubbards to Chester<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Highway 103 from two kilometres west of Exit 6 to four kilometres west of Exit 7 has temporary lane closures for blasting until May 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work is planned for most weekdays at about 10 a.m. and 2 p.m. for about 10 minutes at a time. The eastbound and westbound lanes are both closed during the blasting. Traffic control is in place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There will not be blasting or lane closures on the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>after noon on Fridays<\/li>\n\n\n\n<li>holidays and days before holidays<\/li>\n\n\n\n<li>weekends.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">PICTOU COUNTY: Moore\u2019s Ford Bridge, River John<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Moore\u2019s Ford Bridge on West Branch Road is closed until further notice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The detour route includes West Branch Road, College Grant Road and Route 256.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">PICTOU COUNTY: Route 374, Hopewell<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Route 374 from Old Marshdale Road to Mark Road has alternating lane closures until Friday, October 30, for paving.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traffic control is in place. Work takes place daily from 6 a.m. to 8 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">PICTOU COUNTY: Welsford Bridge, River John<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Welsford Bridge on Old Pictou Road is closed until further notice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The detour route includes Old Pictou Road, Allen Road, Trunk 6 and River John Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">PICTOU COUNTY: Stellarton Intervale Bridge, Stellarton<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Stellarton Intervale Bridge on Bridge Avenue is closed in both directions as a precaution until further notice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A detour is in place via Highway 104.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">YARMOUTH COUNTY: Raynardton Road, Tusket<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Raynardton Road from Highway 103 northerly to Saunders Road has alternating lane closures for paving and guardrail work until Friday, September 25.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work takes place from sunrise to sunset. Traffic control is on-site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source: Provincial Release <\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW WORK KINGS COUNTY: South Bishop Road, Coldbrook South Bishop Road from Trunk 1 to Highway 101 is reduced to<\/p>\n","protected":false},"author":1,"featured_media":12898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6,10,12,13,19],"tags":[],"class_list":["post-13531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general","category-latest","category-news","category-top-videos"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/13531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/comments?post=13531"}],"version-history":[{"count":1,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/13531\/revisions"}],"predecessor-version":[{"id":13532,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/13531\/revisions\/13532"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media\/12898"}],"wp:attachment":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media?parent=13531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/categories?post=13531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/tags?post=13531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}