{"id":5458,"date":"2023-09-29T17:23:17","date_gmt":"2023-09-29T20:23:17","guid":{"rendered":"https:\/\/nnpress.ca\/?p=5458"},"modified":"2023-09-29T17:25:34","modified_gmt":"2023-09-29T20:25:34","slug":"traffic-advisories-2","status":"publish","type":"post","link":"https:\/\/nnpress.ca\/index.php\/2023\/09\/29\/traffic-advisories-2\/","title":{"rendered":"Traffic Advisories."},"content":{"rendered":"\n<p>ANTIGONISH COUNTY: Salt Springs Brook Bridge, Trunk 7<\/p>\n\n\n\n<p>Salt Springs Brook Bridge on Trunk 7, about four kilometres south of the Town of Antigonish, is reduced to one lane until further notice for repairs.<\/p>\n\n\n\n<p>Temporary traffic signals are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>ANTIGONISH COUNTY: Trunk 4, Antigonish<\/p>\n\n\n\n<p>Trunk 4 between James and Church streets is closed, except to local traffic, until October 19 for construction of a roundabout.<\/p>\n\n\n\n<p>Detour signs are in place.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>GUYSBOROUGH COUNTY: Trunk 16, Lincolnville<\/p>\n\n\n\n<p>Trunk 16, from 0.2 kilometres north of the Old Monastery Road northerly to 1.4 kilometres north of the Lincolnville Loop, has alternating lane closures for paving and brush cutting until October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from 6 a.m. to 7 p.m.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>PICTOU COUNTY: Highway 104 and Highway 106, Alma<\/p>\n\n\n\n<p>Highway 104 at Exit 22 to Exit 2 on Highway 106 is reduced to one lane for paving until October 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from 6 a.m. to 8:30 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Trunk 4, Broadway<\/p>\n\n\n\n<p>Trunk 4 between civic numbers 10421 and 10470 is closed for culvert replacement until October 14.<\/p>\n\n\n\n<p>The detour is via Highway 104 between Exit 27 at Sutherland River and Exit 29 at Kenzieville.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>RICHMOND COUNTY: Highway 104, Port Hawkesbury<\/p>\n\n\n\n<p>Highway 104, at St. Peters Railway overpass, is reduced to one lane for repairs until October 14.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from 6 a.m. to 6:30 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Highway 104, Whiteside to Louisdale<\/p>\n\n\n\n<p>Highway 104, from Whiteside to Louisdale, is reduced to one lane for surfacing work until October 31.<\/p>\n\n\n\n<p>Traffic control will be on-site. Work takes place from 6 a.m. to 6:30 p.m.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Port Royal Bridge, Isle Madame<\/p>\n\n\n\n<p>Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: West Bay Road, Port Hawkesbury<\/p>\n\n\n\n<p>West Bay Road, from Nature Dream Boulevard, easterly for 3.8 kilometres, is reduced to one lane for roadwork until October 7.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from 6 a.m. to 6:30 p.m.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>COLCHESTER COUNTY: Donaldson Bridge, French River<\/p>\n\n\n\n<p>Donaldson Bridge on Lake Road, about three kilometres west of Tatamagouche, is closed until further notice.<\/p>\n\n\n\n<p>The detours are on Trout Brook Road and Cooper Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Old Truro Road, Tatamagouche<\/p>\n\n\n\n<p>Old Truro Road, from Kennedy Hill intersection to the Cross Road in North River, is closed until further notice due to a large culvert failure.<\/p>\n\n\n\n<p>A detour is in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Salmon River Bridge, Truro<\/p>\n\n\n\n<p>Salmon River Bridge, on Highway 102 between exits 14 and 14A, is reduced to one lane northbound until October 31 for work on the bridge decking.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Slade Road, Tatamagouche<\/p>\n\n\n\n<p>Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>Source: Release<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ANTIGONISH COUNTY: Salt Springs Brook Bridge, Trunk 7 Salt Springs Brook Bridge on Trunk 7, about four kilometres south of<\/p>\n","protected":false},"author":1,"featured_media":1195,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6,10,12,13,18],"tags":[],"class_list":["post-5458","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general","category-latest","category-news","category-top-stories"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/5458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/comments?post=5458"}],"version-history":[{"count":2,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/5458\/revisions"}],"predecessor-version":[{"id":5460,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/5458\/revisions\/5460"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media\/1195"}],"wp:attachment":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media?parent=5458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/categories?post=5458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/tags?post=5458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}