{"id":8243,"date":"2024-08-09T13:09:57","date_gmt":"2024-08-09T16:09:57","guid":{"rendered":"https:\/\/nnpress.ca\/?p=8243"},"modified":"2024-08-09T13:09:59","modified_gmt":"2024-08-09T16:09:59","slug":"weekly-traffic-advisories-13","status":"publish","type":"post","link":"https:\/\/nnpress.ca\/index.php\/2024\/08\/09\/weekly-traffic-advisories-13\/","title":{"rendered":"Weekly Traffic Advisories."},"content":{"rendered":"\n<p><strong>NEW WORK<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Brookville Road, McLellans Brook<\/p>\n\n\n\n<p>Brookville Road from MacLellans Brook Road to civic number 2310 will be closed for culvert replacement from Monday, August 12, at 6 a.m. until Wednesday, August 14, at 7 p.m.<\/p>\n\n\n\n<p>Traffic will be detoured via MacLellans Mountain Glencoe Road. Detour signs are in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>CONTINUING WORK<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>ANTIGONISH COUNTY: Dunmore Road, Dunmore<\/p>\n\n\n\n<p>Dunmore Road is closed from Marsh Cross Road to Blacksmith Valley Road until Monday, September 30, to replace the Dunmore Brook Bridge.<\/p>\n\n\n\n<p>A detour is in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>ANTIGONISH COUNTY: Highway 104<\/p>\n\n\n\n<p>Highway 104 from the Exit 38 eastbound off-ramp to 300 metres west of the Trunk 4 underpass is reduced to one lane for paving until Saturday, August 31.<\/p>\n\n\n\n<p>Work takes place weekdays from 6 a.m. to 6:30 p.m. Traffic control is on-site.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CAPE BRETON REGIONAL MUNICIPALITY: Kenwood Drive, Sydney River<\/p>\n\n\n\n<p>Kenwood Drive from Oceanview Drive to Kings Road will be closed for construction of a roundabout until Saturday, August 24.<\/p>\n\n\n\n<p>A detour is in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Donaldson Bridge, French River<\/p>\n\n\n\n<p>Donaldson Bridge on Lake Road, about three kilometres west of Tatamagouche, is closed until further notice.<\/p>\n\n\n\n<p>The detours are Trout Brook Road and Cooper Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Old Truro Road, Tatamagouche<\/p>\n\n\n\n<p>Old Truro Road from the Kennedy Hill intersection to Cross Road in North River is closed until further notice because of a large culvert failure.<\/p>\n\n\n\n<p>A detour is in place.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>COLCHESTER COUNTY: Slade Road, Tatamagouche<\/p>\n\n\n\n<p>Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>CUMBERLAND COUNTY: Route 366<\/p>\n\n\n\n<p>A section of Route 366 is closed because of a culvert failure. Only local traffic is allowed from East Amherst to Port Howe. A detour is available via Trunk 6.<\/p>\n\n\n\n<p>The culvert is expected to be replaced this summer.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HALIFAX REGIONAL MUNICIPALITY: Highway 102, Bedford \/ Lower Sackville<\/p>\n\n\n\n<p>Highway 102 near Exit 4C has regular lane closures and construction in both directions until Saturday, August 31, for construction of the Highway 107-Highway 102 interchange.<\/p>\n\n\n\n<p>Work takes place weekdays from 7 a.m. to 3 p.m. in the northbound lanes and 9 a.m. to 6 p.m. in the southbound lanes. Traffic control is on-site. Both lanes will be open in the evening and overnight.<\/p>\n\n\n\n<p>Motorists should expect delays and should use alternative routes when possible.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>HALIFAX REGIONAL MUNICIPALITY: Highway 111 (Windsor Street Exchange), Halifax<\/p>\n\n\n\n<p>Construction on the structure over Mackintosh Street will continue until further notice.<\/p>\n\n\n\n<p>Traffic control is on-site.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>INVERNESS COUNTY: Highway 105, Glendale to River Denys<\/p>\n\n\n\n<p>The section of Highway 105 from Exit 2 to Exit 3 is reduced to one lane for paving until Saturday, August 31.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place weekdays from sunrise to sunset.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>LUNENBURG COUNTY: Highway 103, East River<\/p>\n\n\n\n<p>The on-ramp and off-ramp at Exit 7 westbound on Highway 103 will be closed for construction of a new ramp until Friday, August 16. The ramps are closed 24 hours a day.<\/p>\n\n\n\n<p>A detour is in place and traffic control is on-site.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>PICTOU COUNTY: Route 348, Sunnybrae<\/p>\n\n\n\n<p>Route 348 from the Pictou\u2013Guysborough county line northerly for seven kilometres is reduced to one lane for paving until Friday, August 30.<\/p>\n\n\n\n<p>Work takes place weekdays from 6 a.m. to 8 p.m. Traffic control is on-site.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: Port Royal Bridge, Isle Madame<\/p>\n\n\n\n<p>The Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>RICHMOND COUNTY: St. Peters Fourchu Road, Saint Esprit<\/p>\n\n\n\n<p>St. Peters Fourchu Road will have alternating lane closures for repaving until Monday, September 30.<\/p>\n\n\n\n<p>Traffic control is on-site. Work takes place from sunrise to sunset. Weekend work is expected.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>SHELBURNE COUNTY: Highway 103, Jordan Falls<\/p>\n\n\n\n<p>Highway 103 from Exit 24 easterly for about 7.9 kilometres will have alternating lane closures for paving until Friday, August 23.<\/p>\n\n\n\n<p>Work takes place weekdays from sunrise to sunset. Traffic control is on-site.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p>SHELBURNE COUNTY: Highway 103, Sable River<\/p>\n\n\n\n<p>Highway 103 from the Sable River Bridge easterly for about six kilometres will have alternating lane closures for repairs until Saturday, August 31.<\/p>\n\n\n\n<p>Work takes place weekdays from sunrise to sunset. Traffic control is on-site.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><\/h3>\n\n\n\n<p>Source : Provincial Release <\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW WORK PICTOU COUNTY: Brookville Road, McLellans Brook Brookville Road from MacLellans Brook Road to civic number 2310 will be<\/p>\n","protected":false},"author":1,"featured_media":5639,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6,10,12,13,19],"tags":[],"class_list":["post-8243","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general","category-latest","category-news","category-top-videos"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/8243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/comments?post=8243"}],"version-history":[{"count":1,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/8243\/revisions"}],"predecessor-version":[{"id":8244,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/posts\/8243\/revisions\/8244"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media\/5639"}],"wp:attachment":[{"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/media?parent=8243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/categories?post=8243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nnpress.ca\/index.php\/wp-json\/wp\/v2\/tags?post=8243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}